I am delighted to announce that Orchard Gardens is going to receive a facelift.
Weed Spraying
The scheduled weed spraying in Pocklington is due to take place in approximately 1 week’s time, however, Orchard Gardens has been sprayed last week.
Pot Holes
The road will be checked to identify and repair any actionable damage or defects within the next two weeks.
Resurface
An assessment will also be made by the Area Engineer for possible surface dressing within the proposals for the summer 2018 programme (the 2017 programme is already identified).
You must be logged in to post a comment.