Gully Grate Defects – George Street

ERYC will ensure that the gully grate defects on George Street are repaired by our works team during the drainage works package in the new financial year.  This will then allow the cyclic cleanse to be undertaken without disruption.

The drains cannot be cleaned beforehand as once the grate is removed it will not be able to be put back.

R – Thank you for drawing this to my attention.

This entry was posted in ERYC, Flooding, Pocklington. Bookmark the permalink.