Stamford Bridge Pump – Electrics

The electrics for the Stamford Bridge pump are scheduled to be connected on Friday. At this point the pump will be up and running. Well done all those who have made permanent pumps for Stamford Bridge a reality.

This entry was posted in Flooding, Stamford Bridge. Bookmark the permalink.