ERYC have confirmed that works are scheduled for Hagg Bridge, Sutton Upon Derwent.
Initially this will involve:
- Securing the temporary orange barriers
- Refreshing the road markings including the SLOW markings
When the Bridges department attend to repair the fence, if a road closure is required, consideration will be given to repairing the road surface deterioration to maximise resources.
Well done ERYC.
You must be logged in to post a comment.