Hagg Bridge Works

ERYC have confirmed that works are scheduled for Hagg Bridge, Sutton Upon Derwent.

Initially this will involve:

  1. Securing the temporary orange barriers
  2. Refreshing the road markings including the SLOW markings

When the Bridges department attend to repair the fence, if a road closure is required, consideration will be given to repairing the road surface deterioration to maximise resources.

Well done ERYC.

This entry was posted in Roads, Sutton Upon Derwent. Bookmark the permalink.