The Balk – Kerb and Gully

The condition on the side of the road at The Balk going down to Burnby Hall gardens is starting to raise concerns.

A full length gully has appeared as the grass is being eroded. This has the added problem that the kerb from the footpath is now protruding into the road.

As a short term solution I believe the gully must be filled and white lines painted around the kerb.

To fully deal with the situation I am of the opinion that the grass verge needs to be fully kerbed.

I have requested ERYC investigate the situation to decide the best course of action.

This entry was posted in Pocklington, Roads. Bookmark the permalink.