ERYC have confirmed that there is to be additional monitoring of the Pocklington Beck.
I believe we must replace the word discolouration with pollution. Unfortunately ERYC are unaware what caused the pollution.
Putting this aside I would like to thank ERYC for accepting the failures and putting in additional monitoring.
I welcome the additional monitoring equipment for Pocklington Beck as I am sure Pocklington residents will, especially those who have children at the Maxwell Road Schools. It is also reassuring that flora and fauna within the area of the beck will be further protected.
Well done ERYC.
You must be logged in to post a comment.