Church Road Footpath – Wall and Clean

Yet again the Church Road footpath in Stamford Bridge is covered in mud that has washed down from the bank above. This is forcing residents to walk onto the busy road.

As this is the most used footpath into the village I have requested ERYC clean the footpath at the earliest opportunity.

I have also requested that consideration is given to building a low wall at the bottom of the bank to prevent mud continuing to wash down onto the footpath.

This entry was posted in Footpath, Stamford Bridge. Bookmark the permalink.