Further Blocked Drains – Wilberfoss A1079 West Junction

Between the blocked drain that is flooding the A1079 and the Wilberfoss West junction all six other drains are either broken or blocked.

I have requested ERYC to undertake the required works at the earliest opportunity.

This entry was posted in Roads, Wilberfoss. Bookmark the permalink.