I am pleased to see that the Church Road footpath, Stamford Bridge has been cleaned. I await to hear from ERYC regards a request that consideration is given to building a low wall at the bottom of the bank to prevent mud continuing to wash down onto the footpath.
Prior To Cleaning
Well done ERYC.
You must be logged in to post a comment.