The pot hole on the footpath north of St Edmonds, Stamford Bridge on the A166 that had swallowed a shoe has now been filled with tarmac.
Prior To Repair
Well done ERYC.
The pot hole on the footpath north of St Edmonds, Stamford Bridge on the A166 that had swallowed a shoe has now been filled with tarmac.
Prior To Repair
Well done ERYC.
You must be logged in to post a comment.