Category Archives: Flooding
Stamford Bridge: Shallows Footpath Ponding
It is wonderful to see the new Shallows footpath in Stamford Bridge. Unfortunately this has resulted in ponding. I have requested ERYC to address the issue with possible consideration given to installing two simple gullies.
Stamford Bridge Flooding – Main Street Solution
The permanent pumps for Stamford Bridge have resolved the vast majority of the flooding in the village but there is relatively minor flooding outside the New Inn which needs addressing. A couple of weeks ago, referring to the above photo, which … Continue reading
Stamford Bridge Sewers: Concern With New Prison
As a result of faeces floating near to the drain outside the Indian restaurant in Stamford Bridge on Monday and the odour being rather strong I have raised concerns with regards the planned new prison at Full Sutton. The odour … Continue reading
Yorkshire Water Address Faeces on Main Street
I would like to thank Yorkshire Water for arriving on site within a couple of hours of my phoning them on Bank Holiday Monday to address the faeces on Main Street, Stamford Bridge. I am informed that they cleared out … Continue reading
WARNING – Faeces On Main Street, Stamford Bridge
Please be aware that faeces are floating in the water above the drain outside the Indian Restaurant, Main Street, Stamford Bridge. Yorkshire Water have confirmed someone will attend by 12.00 Tuesday 3 April latest.
ERYC Works: Main Street Flooding
I would like to thank ERYC for the work they are currently doing to address the flooding on Main Street, Sutton Upon Derwent “The issue with carriageway ponding are 2 number gully grates. These fill with straw and mud which … Continue reading
Sutton Upon Derwent Play Area Possible Contamination
As a result of the raising main repair in the Sutton Upon Derwent play area, which was then followed by the Beast from the East, Yorkshire Water are still unable to address the possible contamination until the ground dries out. … Continue reading
WARNING: Full Sutton Flooding
There is currently flooding on the Full Sutton to Fangfoss road in the dip that often contains water. I have informed ERYC Highways and they will visit the site and put in flooding signs if required.
Wilberfoss Foss Beck Erosion – Action Planned
I would like to thank ERYC for their prompt investigation into the issues highlighted in Wilberfoss Foss Beck Erosion – Risk Of Flooding. I am delighted to confirm: “We have inspected the site, and agree that the verge / bund is … Continue reading
Wilberfoss Foss Beck Erosion – Risk Of Flooding
Erosion of the Eastern Bank of Foss Beck through Wilberfoss is causing increased risk of flooding. Since the flooding along Beckside on Boxing Day in 2015, ERYC has made efforts to improve the drainage along the East side of Foss … Continue reading
You must be logged in to post a comment.